Nimrod Engineering Ltd supplies quick hitches for use with a variety of excavators, with a range of pin centres and dipper widths. To reduce the modification and fabrication time needed to fit each different size, a new quick hitch design was required for the 20 tonne range. Design changes were also incorporated to reduce the time and cost of fabrication, avoid complex plate bending, and reduce grinding and finishing time.

The Solution

Manufacturing and assembly issues were solved by changing the centre plate from a complex single plate with six bends to three simple separate plates with single bends. This meant that the bent plates no longer had to match the profile plates perfectly, improving accuracy on assembly, and decreasing preparation work. Effective plate tabbing was employed to reduce the need for expensive jigging. The ease of welding was also considered, allowing sufficient space and cut-outs for the welder to work effectively. A stress analysis was carried out to verify the structural integrity of the design, with additional gussets and stiffeners added as a result (Figure 2).


The Result

The final solution is a simple, cost-effective design, and may be modified easily to fit a range of excavator brands of a given size. Motovated Design and Analysis provided a complete set of true plate profiles, bending, weldment and machining drawings for manufacture.

For more information about this product, contact:
Mark Harrington, Nimrod Engineering Ltd
Ph: +64 3 349 2621
http://www.nimrod.co.nz

nimrodquickhitch_figure1.280

Figure 1. 20T Quick Hitch

nimrodquickhitch_figure2.280
Figure 2. Stress plot of quick
hitch, using symmetry

I was very pleased with the work Motovated carried out for us. They understood what the issues were for a small company like ourselves.

- M. Harrington, Nimrod Engineering Ltd

Related Posts

Motovated Klima Cane Prunner case study Motovated KLIMA CANE PRUNER Case StudyBackground Motovated Design & Analysis has worked with Honeypot Holdings over the past 3 years to...
Motovated Slurry Wall Case Study Motovated Slurry Wall for Amsterdam Subway Station Case StudyBackgroundIn 1997 De Weger Architecten and Ingenieursbureau in The Netherlands requested ...
P11 Bogie Design & Analysis for KiwiRail P11 Bogie Design & Analysis for KiwiRailBackground Late in 2009 KiwiRail commissioned Motovated to engineer a bogie in support of their n...
Motovated SCS Ripper Gearbox Design Case Study SCS Ripper Gearbox Design Case StudyBackground Screening and Crushing Systems (SCS) approached Motovated Design & Analysis to help in t...
Motovated Skellerup 3500 Litre Tank Case Study Motovated Skellerup 3500 Litre Tank Case StudyBackground Skellerup Rotomould approached Motovated Design and Analysis Ltd to aid in the des...